Hartman Walsh completed a critical path outage on a WFGD scrubber reline project for a western based utility company. The existing lining in the vessels exhibited extensive failure. Drawing from our past experience in wet FGD service, Hartman Walsh was able to provide a solution to this problem. In an effort to get the plant back online, Hartman Walsh mobilized the site within hours.

Hartman Walsh removed 0.75 to 1.5” of rubber linings via Ultra-High Pressure Water Jetting, decontaminated the surfaces to acceptable levels, abrasive blasted the substrate to white metal, and applied a fiberglass mesh reinforced abrasion resistant epoxy coating system at 120-150 mils DFT. Hartman Walsh completed the project ahead of schedule due to a unique application process and our professional craftsmen.

The owner was so happy with the quality, product and service provided on the original contracted vessels, that they added the remaining four vessels and numerous other projects to the scope.

 

Project Photos

Western USA
 
Western USA
 
Western USA